Maximize the Plant Load Availability & Plant Load Factor
With the technical expertise at Triumph and Company we focus on the availability with reliable operation and reducing the downtime / unplanned outages.
Stabilization of the plant within 90 days from the date of taking charge of the project for the optimal performance of the plant.
Fine Tuning the Operational Parameters
Focusing on the critical parameters and optimizing the same for improving the performance
- Working pressure
- Working temperature
- Bed height
- Furnace temperature
- Air flow for optimum excess Air based on flue gas analysis
Optimization of Net Plant Heat Rate
We always focus the concept of efficient combustion by optimizing the operation techniques
We concentrate on the ways to maintain low net plant heat rate, even different types of fuel is used
Maximize the Generation of Steam / Power
Our ultimate aim in the O&M assignment is reduction of power consumption of the plant equipments
This is implemented by introducing VFD for rotating equipments and proper utilization of electricity inside the plant.
Identify the Vital, Essential and Desirable Spares (VED Analysis)
Sourcing the spares as per OEM recommendations or competent alternative available in market
Maintaining the minimum inventory stock
Reliability of spares